Installation socket direction and the flow direction of the plastic pipe whether the relationship?
              When installing plastic pipes, and other pipelines, like, generally require socket direction toward the water, this is mainly due to consider two aspects, one is to reduce resistance to water flow in the pipeline when the second is to prevent water, firewood and other miscellaneous inside was stuffed into the socket gap, so in practice, require socket direction toward the water, but the water department in many big cities, in order to facilitate practical, underground pipelines have been connected into a network, when a well failure , water will flow to support the direction from the socket, this does not affect the pipe under pressure and does not reduce the sealing performance apron because the water pressure inside the pipe produced, either the socket or socket toward the direction towards the water Water direction, are equal.


Plastic pipe afraid of cold? Buried deep more appropriate?
            Plastic pipes are the same as steel pipes and cast iron pipes. During construction, the top of the pipes should be less than 20cm higher than the permafrost layer, because water freezes at 0 ?? and the volume is large at - 4 ??, which will cause volume expansion. Like other pipes, plastic pipes will inevitably break, Even in the areas not frozen in the south, various factors such as compaction, load, cultivation and so on should be taken into account. Therefore, the relevant regulations require that the buried depth be less than 70cm..


How to open the trunk pipe butt on the distribution network? You should pay attention to what matters?
           In the pipeline has been built after the opening, there are usually several ways: as the old pipes are cast iron pipe, pipe diameter opening of the new and the old pipes are the same or less than the old pipe size, easy to use iron plate made in three, in Stone disc tray or in reducing tees, stuffed Yau Ma Tei, asbestos cement fight with the 5th port or lead directly hit the mouth, and then with the plastic pipe flange butt; if the old pipe is a plastic pipe, the newly installed four-way , three pieces of plastic pipe, and then saw off the pipe on both sides of the original installation of two corresponding flange retainer can then be connected to both sides of our plant reels cross, tee and other pipe fittings; pipe opening can also by using the interface saddle mounted, but the opening diameter of the new pipe is not more than 1/2 of the original pipeline, when more than one opening on the same one pipe, the spacing between two adjacent openings is not less than 7 times the original diameter of the pipe, openings from pipe joints net distance should not be smaller 300mm.

Tel: 0086-579-82580008 82580222
Copyright © Zhejiang peak Holding Group Co., Ltd   ICP:11006670-1     Design:www.kckj.cc    Admin
成人性生活爱爱网站免费 | 国产一级 片内射视频播放蘑菇 | 久久综合涩涩韩国素人网 | 狠狠色婷婷7777久夜色撩人Ⅰ | 亚洲AV无码久久蜜桃杨思敏 | 性感美女日韩欧美尤物 | AV地址在线观看 | 成年深夜小视频看看 | 国产高潮流白浆A片免费老牛 | 午夜无码熟熟妇丰满人妻视频 | 人妻三级无码导航 | 艳妇乳肉豪妇荡乳AV无码利 | 国产av已满18 | 特级精品一区二区三区 | 久久人妻熟女一区二区 | www.精品无码热 | 少妇精品无码一区二区三区大长颈 | 一级毛片女人水真多 | 嘿咻嘿咻免费网站 | 老牛影视av一区二区 | 国产老女人乱伦一区 | freesex欧美 | 亚洲综合在线小说 | 麻豆FreeHDXXX传媒 | av在线观看免费网站播放 | 蜜桃免费网站一区 | 欧美视频点击进入 | 久久午夜一级大片 | AVHD101精品无码1分钟 | av三级在线观看 | 五月天黄色播播网 | 亚洲.无码.变态.欧美.中文 | 日本在线不卡播放 | 人妻精品爽爽爽爽爽 | 91超碰在线欧美人 | 久久成人在线观看 | 国产大学生一二三区 | 懂色av粉嫩av绯色 | 成人3D动漫一区二区三区91 | 中文字幕一区二区视频 | 成人做爰高潮片免费看三区 |